SITE PREVIEW
Enable JavaScript
EASTERN
UTILITY PARTNERS
Menu

SUSTAINABLE, SECURE COMPUTE

WAYS TO PARTICIPATE

Wholesale Compute

Buy capacity. Put it to work.

Precisely machined pale and olive cubic forms separated by deep channels.
  • Wholesale compute capacity.
  • Use it or resell it.
  • Optional resale management.
  • Electricity & rent included.
  • SLA securing output hours.

INTERACTIVE / PLANNING MODEL

Your capacity.
Your resale model.

Choose capacity, set your selling assumptions, and compare a modeled purchase with the gross receipts it could generate.

This adjustable model is separate from the fixed wholesale illustration below. Illustrative results, not guaranteed.

02 / MODELED PURCHASE

Illustrative wholesale purchase—Hardware + six-month operating reserve
Hardware allowance—
Operating reserve—

Choose your own capacity; this is not a facility target.

03 / GROSS RESALE RECEIPTS

Gross resale receipts—
Gross receipts / purchase—
Gross receipts reach purchase—
GPU-hours sold / month—

Gross resale collections, before selling costs, management fees and other deductions.

Cumulative collections

Months from funding
Illustrative cumulative receiptsEnable JavaScript to calculate this scenario. A numerical phase table follows the chart.
Gross collectionsInitial funding
View monthly phase breakdown
Illustrative monthly amounts by operating phase
Operating phaseGross revenue

Enable JavaScript to calculate and change this illustrative scenario.

How this model works

The operating model

Adapted from the Zaba planning model. Each assembly represents eight GPUs and 70,080 available GPU-hours per year before utilization. Hardware is modeled at $330,000 per assembly, including a 10% procurement allowance.

Uses 80% service capacity and 20% standby, with 48 service months after the selected planning delay. Capacity is an adjustable scenario input. Managed sales fees and selling costs are excluded. SLA insurance and later service funding remain to be finalized.

Costs and timing

The base budget uses $624,317.35 annual shared costs plus $26,565.79 per assembly, and monthly hosting of $53,757.81, $60,346.35 or $66,934.90 for one, two or three nine-assembly racks. A $100,000 annual certification supplement ends after 36 operating months. Figures are provisional planning allowances.

The reserve equals six months of the initial operating budget. Warranty upgrades, future hardware replacement and unpriced costs are excluded. Default prices of $5.25, $8 and $12 per GPU-hour are staged assumptions, not forecasts or current quotes.

Reading the result

Annualized gross-receipts equivalent: —. This is a mathematical comparison, before selling costs and management fees; it is not net return or cash-flow IRR.

Months run from funding. Receipts include recovery of original capital. Annualized receipts = (total receipts / initial funding)^(12 / elapsed months) − 1; this is not cash-flow IRR.

The wholesale purchase model does not deduct the operator’s costs from gross buyer collections.

TAKE THE NEXT STEP

Put your capacity requirements
into a conversation.

Discuss compute capacity
02 / ILLUSTRATION

An illustrative
scenario.

Lines & figures: 85% hours sold.

4.21×Total receipts
36.0%Annualized6
2 yr 2 mo1× payback
4 yr 8 mo4.21× total receipts

Illustrative targets, not guaranteed. Eligibility and terms apply. Total proceeds include original capital.

03 / CONTEXT

Assumptions & terms.

5. Illustrative targets, not guaranteed. Eligibility and terms apply. Total proceeds include original capital.

6. Annualized = (total receipts / initial capital)^(1 / elapsed years) − 1; not cash-flow IRR.

YOUR NEXT STEP

Let’s discuss
your requirements.

Discuss compute requirements ↗

Compare options ↗